The 2X600MW units of the third phase of Hebi Fenghe Power Plant were jointly invested by Henan Investment Group Co., LTD., Hebi Coal Industry (Group) Co., Ltd. and Hebi Economic Development Construction Investment Co., LTD. They were constructed and operated by Hebi Fenghe Power Generation Co., Ltd. and put into operation at the end of 2007.
Now, Hebi Fenghe Power Generation Co., Ltd. plans to carry out industrial steam and heat supply renovations on two N600-24.2/566/566 supercritical condensing steam turbine units of Fenghe Power Generation, and expand the boiler feed water treatment facilities as a supporting facility. The largest external steam supply capacity of the entire plant is 2×100t/h, and each unit has an industrial steam supply capacity of 200t/h.
Process flow:
The design is based on the corresponding equipment of the newly built 3X80t/h reverse osmosis unit and 3X70t/h EDI unit.